Project Type
Landslides & Slope Stability
Scope
Detailed design for draped mesh rockfall protection
Completion
2023
Our Role
RGS were engaged to undertake a hazard assessment and develop a design to mitigate rockfall hazards in a section of road cutting 20m deep on the Waterfall Way between Bellingen and Dorrigo.
Project Challenges
Challenges for the project included:
- Minimising environmental impacts to the adjacent world heritage national park.
- Narrow verge and clear fall zone along the base of the cutting.
- Managing works to minimising the impacts to road users.
Project Deliverables
The detailed design and reporting included:
- Development of a draped mesh design to control rockfall movement by guiding falling debris to a collection point at the toe of the slope to protect road users and vehicles from damage.
- Preparation of detailed design drawings in CAD format.
- Construction staging, materials specifications and hold points.
- Safety in design analysis.

Project Outcomes
The key outcomes realised by this project include:
- Future proofing the section of road from upslope instability;
- Improved road safety for all road users; and
- Achieving value for money through providing effective solutions under the site’s topography and traffic conditions.
Related Projects
More regional NSW projects from our team.
Flood Damage Remediation Works
Byabarra NSW
Landslide Remediation Works
Glenugie to Tyndale, Pacific Highway NSW
Cutting Remediation Works
Cangai Cutting, Gwydir Highway (Bruxner Highway)
Landslide Remediation Works
Northern Rivers NSW
Bridge Replacement
Mitchells Flat NSW
Temporary Design Works
Glenugie to Tyndale, Pacific Highway NSW





