Project Overview
Numerous sections of this Road near Byabarra within the Port Macquarie Hastings area were damaged during the June 2021 East Coast Low event. One section of the road experienced landsliding in the upslope cutting and loss of the downslope road embankment due to landslide and scour associated with flooding of a Creek.
Our Role
As part of the recovery works RGS were tasked with providing concept options and detailed design for the remediation works.
The purpose of the concept design stage was to define treatment options and evaluate the remedial treatments in terms of constructability and long-term performance and present these for consideration to the local Council.
The option of a tensioned mesh soil nail slope (upslope cutting) and gabion wall revetment (embankment protection downslope) were selected for development into detailed design.
Project Challenges
Challenges for the project included:
- Minimising property impacts.
- Staging of works and minimising the impacts to road users.
- Environmental constraints associated with fisheries and waterways.
- Recommendations on construction works, construction staging, materials specifications and hold points.
- Safety in design analysis.

Project Outcomes
The key outcomes realised by this project include:
- Future proofing the section of road from upslope and downslope instability;
- Improved road safety for all road users; and
- Achieving value for money through providing effective solutions under the site’s environmental conditions and topography.
Related Projects
More regional NSW projects from our team.
Landslide Remediation Works
Glenugie to Tyndale, Pacific Highway NSW
Cutting Remediation Works
Cangai Cutting, Gwydir Highway (Bruxner Highway)
Landslide Remediation Works
Northern Rivers NSW
Rockfall Protection Works
Waterfall Way between Bellingen & Dorrigo, NSW
Historic House Restoration
Lake Macquarie NSW
Road Rehabilitation
Old Bar Road, MidCoast NSW