Project Type
Landslides & Slope Stability
Scope
Construction supervision landslide remediation
Completion
2020
Project Overview
During construction of the Pacific Highway Upgrade, construction of a cut in weathered rock exposed translational sliding within clay filled bedding planes along about 150m of the cut batter.
Our Role
As part of the remediation works, RGS was tasked with supervising the remediation construction works to the design. RGS was responsible for:
- Monitoring cut stability,
- Verifying the excavations,
- Verifying the foundation of a rockfill shear key below the slide plane to meet the design; and
- Cutting regrading and batter treatments works.
Project Challenges
Challenges for the project included:
- Undertaking the excavation works on an actively moving landslide;
- Staging of works in short sections to control the slope movements; and
- Management of risks to the plant operators.

Project Outcomes
The key outcomes realised by this project include:
- Future proofing the section of highway from upslope and instability; and
- Improved road safety for all road users.
Related Projects
More regional NSW projects from our team.
Flood Damage Remediation Works
Byabarra NSW
Cutting Remediation Works
Cangai Cutting, Gwydir Highway (Bruxner Highway)
Landslide Remediation Works
Northern Rivers NSW
Rockfall Protection Works
Waterfall Way between Bellingen & Dorrigo, NSW
Bridge Replacement
Mitchells Flat NSW
Temporary Design Works
Glenugie to Tyndale, Pacific Highway NSW