Project Overview
The project involved construction of a 36 kilometre section of the Pacific Highway.
The new section featured 60 bridges, including nine local road overpasses which provide safe and convenient access across the motorway.
Our Role
As part of the construction works RGS were tasked with providing both design and on-site construction advice for temporary haul roads, piling pad and crane pad platforms for the 60 bridges, and access points required for the project.
Project Challenges
Challenges for the project included:
- Soft soils underlying the bridge locations. Many of the bridges were multi spanned structures being built across a floodplain underlain by soft soils.
- Many of the bridge foundations required ground treatment in the form of rockfill with high strength structural fabric to achieve the required FoS for the short-term works.
- Environmental constraints associated with fisheries and waterways.
Project Deliverables
Detailed design and reporting included:
- Preparation of design reports including slope modelling, punching and bearing pressure analysis and construction staging works.
- Recommended construction works, construction staging, materials specifications and hold points.
- Safety in design analysis.

Project Outcomes
The key outcomes realised by this project include:
- Future proofing the section of highway from flooding;
- Improved road safety for all road users; and
- Achieving value for money through providing effective solutions for the geotechnical and environmental conditions along the project.
Related Projects
More regional NSW projects from our team.
Historic House Restoration
Lake Macquarie NSW
Bridge Replacement
Mitchells Flat NSW
Bridge Foundation & Temporary Works Design
Romiaka Bridge, Clarence Valley NSW
Multi Storey Development – Investigation & Foundation Design
Coffs Harbour NSW
Coffs Harbour Bypass
Coffs Harbour
Landslide Remediation Works
Glenugie to Tyndale, Pacific Highway NSW