Regional Geotechnical Solutions
Cutting Remediation Works

Cutting Remediation Works

Cangai Cutting, Gwydir Highway (Bruxner Highway)

Project Type
Landslides & Slope Stability
Scope
Detailed Design for Shotcrete & Draped Mesh
Completion
2023

Project Overview

This cutting located on the Bruxner Highway is a 300m long cutting that had a long history of slope hazards. The hazards included:

  • Mixed soil and rock slides (adversely orientated bedding planes);
  • Planar rock sliding (adversely orientated bedding planes); and
  • Boulder detachments from a weathered igneous dyke.

The aim of the project was to tailor a design which mitigated the hazard of landslides and rockfalls to the road users.

Our Role

As part of the remediation works RGS were tasked with providing concept options and detailed design for the remediation works.

The purpose of the concept design stage was to define treatment options and evaluate the remedial treatments in terms of constructability and long-term performance and present these for consideration.

Due to the range of hazards that were document and observed at the site. A number of slope treatments were adopted for remediation at the site.

The remediation works involved:

  • Trimming the cut back to the dip angle of the bedding planes (approx. 40 degrees);
  • Construction of a bench in the cutting;
  • Construction of shotcrete protection treatment to the igneous dyke;
  • Construction of draped mesh to contain rock slide debris; and
  • Deepening the rock catch trench to contain rockfall debris.

Project Challenges

Challenges for the project included:

  • Staging of works and minimising the impacts to road users.
  • Management of spoil generated from the cut regrading works.

Project Deliverables

The detailed design and reporting included:

  • Preparation of detailed design drawings in CAD format.
  • Construction staging, materials specifications and hold points.
  • Safety in design analysis.
Cutting Remediation Works

Project Outcomes

The key outcomes realised by this project include:

  • Future proofing the section of road from upslope and downslope instability; and
  • Improved road safety for all road users.

Related Projects

More regional NSW projects from our team.

Flood Damage Remediation WorksLandslides & Slope Stability

Flood Damage Remediation Works

Byabarra NSW

Landslide Remediation WorksLandslides & Slope Stability

Landslide Remediation Works

Glenugie to Tyndale, Pacific Highway NSW

Landslide Remediation WorksLandslides & Slope Stability

Landslide Remediation Works

Northern Rivers NSW

Rockfall Protection WorksLandslides & Slope Stability

Rockfall Protection Works

Waterfall Way between Bellingen & Dorrigo, NSW

Bridge ReplacementFoundations

Bridge Replacement

Mitchells Flat NSW

Temporary Design WorksFoundations

Temporary Design Works

Glenugie to Tyndale, Pacific Highway NSW

Need Practical Geotechnical Advice For Your Next Project?

Regional Geotechnical Solutions provides specialist geotechnical and geo environmental consulting services across regional NSW with practical, reliable, and technically sound project support.

Get in Touch View Capabilities