Geotechnical input to Historic House Restoration
Completion
2025
Project Overview
RGS was engaged to assist with the restoration work of a house structure badly damaged by fire in 2019. The development upgraded the internal structure while maintaining the historical facade.
Our Role
RGS was engaged to undertake the following:
- Vibration monitoring on retained façade demolition of internal walls.
- Construction recommendations for temporary works
- Foundation assessment for bored piles
Project Challenges
Consideration of heritage components of the structure, with alternative low impact demolition techniques implemented. Variable subsurface profile.

Project Outcomes
Demolition completed within vibration tolerances. Geotechnical components of the project completed as per the design.
Related Projects
More regional NSW projects from our team.
Bridge Replacement
Mitchells Flat NSW
Temporary Design Works
Glenugie to Tyndale, Pacific Highway NSW
Bridge Foundation & Temporary Works Design
Romiaka Bridge, Clarence Valley NSW
Multi Storey Development – Investigation & Foundation Design
Coffs Harbour NSW
Flood Damage Remediation Works
Byabarra NSW
Road Rehabilitation
Old Bar Road, MidCoast NSW