Project Overview

Regional Geotechnical Solutions was engaged to undertake a pavement investigation and design for a proposed roundabout providing access to a residential development.

The project involved the proposed widening of an existing road and construction of a new roundabout, upgrade of the Road approach, and construction of a new road to service the residential development.

The assessment included investigation of the existing pavement profile, subgrade conditions, pavement material quality, groundwater conditions, and design requirements for new and widened pavement areas.

Our Role

RGS provided geotechnical and pavement engineering services including:

  • Investigation of existing pavement and subgrade conditions
  • Borehole and test pit investigations across the existing road and proposed road widening areas.
  • Laboratory CBR, grading and plasticity testing.
  • Assessment of existing pavement gravels for potential reuse
  • Pavement thickness design for widening, roundabout approaches, access road and the proposed roundabout.
  • Proof rolling of exposed subgrade during construction to identify soft or moisture-affected areas requiring treatment.
  • Provision of practical geotechnical advice during construction to assist with subgrade treatment, pavement construction, and tie-in works.
  • Construction advice for tying new pavement into existing pavement.
  • Drainage and construction methodology recommendations.

Project Challenges

The project required pavement design across low-strength, moisture-sensitive residual clay and extremely weathered siltstone subgrades, with adopted design CBR values as low as 2%.

Additional challenges included:

  • Existing pavement materials not meeting DGB20 base specifications.
  • Highly expansive subgrade conditions.
  • Need to tie widened pavement areas into the existing pavement.
  • Heavy vehicle turning forces within the roundabout and approaches.
  • Existing services within the road shoulders.
  • Drainage management to avoid water being trapped within widened pavement sections.
Pavement Investigation & Design

Project Outcomes

RGS developed practical pavement design solutions for the proposed roundabout and road widening works, including flexible pavement designs for existing roads, access road and a heavy-duty roundabout pavement incorporating polymer modified asphalt, deep lift asphalt, stabilised subbase and select fill.

The investigation allowed existing pavement materials to be assessed for reuse as select fill, helping reduce waste and construction costs while supporting a pavement design suitable for the expected traffic loading and site conditions.

Related Projects

More regional NSW projects from our team.

Road RehabilitationRoads & Road Rehabilitation

Road Rehabilitation

Old Bar Road, MidCoast NSW

Bridge ReplacementFoundations

Bridge Replacement

Mitchells Flat NSW

Temporary Design WorksFoundations

Temporary Design Works

Glenugie to Tyndale, Pacific Highway NSW

Bridge Foundation & Temporary Works DesignFoundations

Bridge Foundation & Temporary Works Design

Romiaka Bridge, Clarence Valley NSW

Coffs Harbour BypassEarthworks

Coffs Harbour Bypass

Coffs Harbour

Landslide Remediation WorksLandslides & Slope Stability

Landslide Remediation Works

Glenugie to Tyndale, Pacific Highway NSW

Need Practical Geotechnical Advice For Your Next Project?

Regional Geotechnical Solutions provides specialist geotechnical and geo environmental consulting services across regional NSW with practical, reliable, and technically sound project support.

Get in Touch View Capabilities