Project Overview
Numerous sections of this Road near Thora were damaged during the June 2007 East Coast Low event. One of the bridges experienced deep scouring around the abutments and the embankment due associated with flooding of the creek.
Our Role
As part of the recovery works, RGS were tasked with providing concept options and detailed design for the remediation works to protect the embankment and the creek lining around the bridge.
The purpose of the concept design stage was to define treatment options and evaluate the remedial treatments in terms of constructability and long-term performance and present these for consideration.
The option of a gabion and rockfill revetment was selected for development into detailed design.
Project Challenges
Challenges for the project included:
- Difficult access.
- Staging of works and minimising the impacts to road users.
- Environmental constraints associated with fisheries and waterways.
Project Deliverables
The detailed design and reporting included:
- Preparation of design reports including slope modelling and construction staging works.
- Preparation of detailed design drawings in CAD format.
- Recommendations on construction works, construction staging, materials specifications and hold points.
- Safety in design analysis.

Project Outcomes
The key outcomes realised by this project include:
- Future proofing the bridge from flood scour and slope instability;
- Improved road safety for all road users; and
- Achieving value for money through providing effective solutions under the site’s environmental conditions and topography.