Project Overview
This Solar Farm is a 720MW development that is located in the New England Region of NSW. Stage 1 of the project involved the construction of a 400MW facility.
Our Role
RGS provided geotechnical consulting services for Stage 1 of the development with respect to the construction of 34km of internal pavements and upgrading and maintenance of the external pavements that provided access to the site.
Project Challenges
Construction commenced during a period of prolonged rainfall which presented significant challenges due to the geometric design, lack of available materials and budget constraints.
The subgrade materials encountered along the alignment were highly variable and ranged from very high strength granite outcrops, to loose saturated sands and low strength reactive clay.

Project Outcomes
The internal and external pavements associated with the project provide all weather access for the operation of Stage 1 of the solar farm and will provide access for the construction of Stage 2.